Skip to content

Pull requests: openshift/release

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

ci: add medik8s-polarion-reporter Prow step for Polarion XUnit import approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80497 opened Jun 14, 2026 by maximunited Loading…
Add SHARED_DIR kubeconfig support for benchmark-runner ok-to-test Indicates a non-member PR verified by an org member that is safe to test.
#80496 opened Jun 14, 2026 by arpsharm Contributor Loading…
Add weekly disconnected FAR E2E periodic job for medik8s/system-tests approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80494 opened Jun 14, 2026 by ugreener Contributor Loading…
WIP: test approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#80493 opened Jun 14, 2026 by eggfoobar Contributor Loading…
Restore FIPS presubmit tests to required on main branch rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#80488 opened Jun 13, 2026 by redhat-chai-bot Contributor Loading…
Make FIPS presubmit tests optional on main branch
#80489 opened Jun 13, 2026 by redhat-chai-bot Contributor Loading…
Add CUDN pod churn and CUDN churn periodic tests for 5.0
#80485 opened Jun 12, 2026 by mohit-sheth Member Loading…
2 tasks
NO-JIRA: feat: add sharding to tna recovery lanes 4.23 5.0 jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#80484 opened Jun 12, 2026 by eggfoobar Contributor Loading…
azure: use Standard v3 instance types for OCP 4.21 and older
#80483 opened Jun 12, 2026 by sdodson Member Loading…
3 tasks
Limit recert hardware jobs to intranet approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80482 opened Jun 12, 2026 by omertuc Contributor Loading…
NO-JIRA: Remove openstack-beta RPM mirror repos and services jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#80480 opened Jun 12, 2026 by stephenfin Contributor Loading…
OCPBUGS-87841: ci-operator/step-registry/ipi/install/install: Unpack log-bundle archives approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#80479 opened Jun 12, 2026 by wking Member Loading…
Spot check jobs for azure v7 instances on 4.13-4.22 approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80478 opened Jun 12, 2026 by sdodson Member Loading…
2 tasks
Disable gke-nongroovy-e2e-tests on PRs for stackrox/stackrox approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged.
#80477 opened Jun 12, 2026 by AlexVulaj Contributor Loading…
Add Chaibot test failure triage workflow to ci-chat-bot rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#80476 opened Jun 12, 2026 by chaclark1974 Contributor Loading…
[WIP] Use .ci-operator.yaml from rhobs/observability approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#80474 opened Jun 12, 2026 by simonpasquier Contributor Loading…
do not merge: just for testing approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#80473 opened Jun 12, 2026 by psturc Member Draft
ROSAENG-8246: Bump ocm-api-metamodel Prow build image to Go 1.25 jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#80472 opened Jun 12, 2026 by Lir10 Loading…
2 tasks
OCPCLOUD-3513: cluster-api-provider-aws: inject oc-cli into test/e2e-aws-capi-techpreview jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#80470 opened Jun 12, 2026 by hongkailiu Member Loading…
Migrate int and stg e2e jobs to slot-manager do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#80467 opened Jun 12, 2026 by roivaz Contributor Draft
OCPBUGS-88483: MCO: Use arm64-latest pattern in the arm64 jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#80466 opened Jun 12, 2026 by sergiordlr Contributor Loading…
OSAC-1377: Add skip_if_only_changed filters to osac-aap e2e-vmaas test jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#80463 opened Jun 12, 2026 by amej Contributor Loading…
9 tasks done
CORENET-7277: Security ci/prow/security fails for PR openshift/cluster-network-operator#3017 which is to bump k8s to 1.36.1 jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#80462 opened Jun 12, 2026 by miheer Contributor Loading…
openstack: inherit TEST_ARGS in openstack-tests steps approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80459 opened Jun 12, 2026 by mandre Member Loading…
stackrox: Add 3h timeout to ocp-4-create step approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged.
#80452 opened Jun 12, 2026 by davdhacs Contributor Loading…
ProTip! Adding no:label will show everything without a label.