ProjectEngine

Excel-native dependency-driven planning engine focused on transparency, simulation, diagnostics, and project controls workflows.

ProjectEngine transforms a standard Excel workbook into a lightweight scheduling and project controls platform powered entirely by VBA. It combines dependency-driven schedule calculation, planning analytics, Gantt visualization, S-Curve reporting, constraints management, simulation tools, and runtime diagnostics in a single portable workbook.


Screenshots

Interactive Gantt

Interactive Gantt

Dependency-driven scheduling with progress tracking, milestones, summary tasks, critical path analysis, and real-time project status visualization.

Executive Dashboard

Executive Dashboard

High-level project overview including progress indicators, forecast finish analysis, critical activities, schedule momentum, S-Curve snapshot, and planning overview.

Hot Spots Analysis

Hot Spots Analysis

Dedicated planning analytics highlighting top delays, deadline health, upcoming milestones, and next critical activities requiring attention.

Month View

Month View

Long-range schedule visualization with monthly scaling, WBS hierarchy, task classifications, constraints, dependencies, milestones, and progress status.

S-Curve Analytics

S-Curve Analytics

Baseline, Actual, Forecast, and Calculated progress curves combined with daily workload distribution for project controls reporting and performance analysis.

Animated Demo

ProjectEngine Demo


Core Features

Scheduling Engine

  • Dependency-driven scheduling
  • FS / SS / FF relationships
  • Positive and negative lag support
  • Multi-predecessor logic
  • Automatic schedule propagation
  • Parent / child rollups
  • Level of Effort (LOE) support
  • Milestone support

Planning Logic

  • Baseline planning
  • Forecast planning
  • Actual progress integration
  • Calculated schedule generation
  • Incremental recalculation
  • Forced full recalculation

Analytics

  • Critical Path analysis
  • Longest Path analysis
  • Total Float calculation
  • Free Float calculation
  • Multi-project criticality mode
  • Delay analysis
  • Deadline monitoring
  • Schedule momentum tracking

Constraints & Controls

  • Hard constraints engine
  • Deadline management
  • Constraint diagnostics
  • Constraint impact analysis
  • Dedicated constraints table

Visualization

  • Interactive Gantt chart
  • Day / Week / Month timeline scaling
  • Dependency link rendering
  • Critical path overlays
  • Progress overlays
  • Constraint overlays
  • Executive Dashboard
  • S-Curve reporting

Simulation

  • Test mode planning
  • Scenario mode planning
  • Schedule comparison workflows
  • Non-destructive schedule simulation

Diagnostics

  • Runtime warning console
  • INFO / WARNING / STOP severities
  • Event History
  • Alarm History
  • Warning acknowledgement workflow
  • Stable event signature tracking
  • Input validation framework

Maintenance & Safety

  • Safe Empty State for Gantt
  • Safe Empty State for S-Curve
  • Planning Reset workflow
  • Full Reset workflow
  • Protected calculated columns
  • Controlled system writes

Architecture

ProjectEngine is organized around a calculation core and multiple visualization layers.

Layer Purpose
WBS User planning inputs and outputs
CALC Scheduling engine runtime layer
CONSTRAINTS Constraints and deadlines
GANTT Schedule visualization
SCURVE Progress and workload analytics
DASHBOARD Executive reporting
EVENT_HISTORY Runtime traceability
CALC_ALARM Active warnings and stops
EVENT_ACK Warning acknowledgement management

The scheduling engine is the single source of truth.

Visualization layers consume calculated data but never drive schedule calculations.


Typical Workflow

  1. Enter planning data in WBS.
  2. Run Planning Update.
  3. Review warnings and diagnostics.
  4. Analyze schedule health through Dashboard and S-Curve.
  5. Review Critical Path and Float analytics.
  6. Simulate alternatives using Test and Scenario modes.
  7. Generate reporting through Gantt and Dashboard views.

Project Status

Current Stage

Beta

The engine is actively used and continuously improved through real-world planning use cases.

Major scheduling, analytics, dashboard, diagnostics, and reset frameworks are operational.

Future releases will continue improving usability, visualization, and advanced planning capabilities.


Support the Project

If ProjectEngine helps your work and you would like to support ongoing development:

QRCode


License

GPL-3.0

About

Lightweight Excel/VBA planning engine for project scheduling, simulation, and controls.