CNTRLPLANE-3600: Bump k8s to v0.36.1, controller-runtime to v0.24.1, CAPI to v1.12.8#8695
Draft
bryan-cox wants to merge 4 commits into
Draft
CNTRLPLANE-3600: Bump k8s to v0.36.1, controller-runtime to v0.24.1, CAPI to v1.12.8#8695bryan-cox wants to merge 4 commits into
bryan-cox wants to merge 4 commits into
Red Hat Konflux / Red Hat Konflux / hypershift-release-mce-50-on-pull-request
failed
Jun 8, 2026 in 1m 52s
Failed
Red Hat Konflux/hypershift-release-mce-50-on-pull-request has failed.
Details
- Namespace: crt-redhat-acm-tenant
- PipelineRun: hypershift-release-mce-50-on-pull-request-xz2pw
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 5 seconds | |
| 🟢 Succeeded | 7 seconds | |
| 🟢 Succeeded | 35 seconds | |
| 🟢 Succeeded | 11 seconds | |
| 🔴 Failed | 45 seconds |
Failure snippet:
task build-images has the status "Failed":subprocess exited with status 2 subprocess exited with status 2 Error: building at STEP "RUN make hypershift && make hypershift-no-cgo && make hypershift-operator && make product-cli && make karpenter-operator": exit status 2
Loading