Skip to content

Mark this repo to be "outdated" and link to the new one.#14496

Open
ca-stefan-cordes wants to merge 1 commit into
mulesoft:masterfrom
ca-stefan-cordes:patch-2
Open

Mark this repo to be "outdated" and link to the new one.#14496
ca-stefan-cordes wants to merge 1 commit into
mulesoft:masterfrom
ca-stefan-cordes:patch-2

Mark this repo to be "outdated" and link to the new one.

1c70199
Select commit
Loading
Failed to load commit list.
Traceability Check / Traceability Check skipped Mar 11, 2026 in 3s

Check execution skipped

The check could not be assessed

Pull Request number not received from GitHub, in most cases this scenario can be related to:

  • The check was triggered by the Pull Request preview screen.
  • The check was triggered by a Pull Request coming from a fork.
  • The check was triggered after the Pull Request was merged.