Skip to content

docs(stage2): record successful Lab2 S2-RO-09 revalidation - #89

Merged
Robinlee0929 merged 1 commit into
mainfrom
codex/stage2-s2-ro-09-live-status-documentation-correction
Sep 14, 2026
Merged

Robinlee0929 merged 1 commit into
mainfrom
codex/stage2-s2-ro-09-live-status-documentation-correction

Conversation

@Robinlee0929

Copy link
Copy Markdown
Owner

Summary

Updates the canonical S2-RO-04 and S2-RO-09 documents to record the already accepted post-remediation Lab2 live result. Historical failure and NOT_YET_VERIFIED states remain explicitly historical.

Current accepted status

  • S2-RO-04 credential representation remediation and independent remediation review: PASS.
  • Lab2 Ed25519 pin verification and password authentication: PASS.
  • Exact /interface vrrp print detail: PASS; exit status 0, no stderr, one execution, zero retries.
  • RouterOS configuration mutation: none.
  • S2-RO-09 Lab2 compatibility: PASS.

Traceability

  • Remediation candidate: cbf90a98dee6e11b6b125ad778e73f5ca7f6d1d3.
  • Remediation PR: fix(stage2): normalize Windows credential blob for SSH auth #88.
  • Remediation merge: 7a244c42d5d6f8de0499cd0e4619aee89bba6d9c.
  • Candidate/merged tree: 0f47bb855bcf40c46b14c6feab8aa11c0eda6456.
  • Prior post-merge Safe CI: 34824181847 (historical remediation evidence, not this PR's CI).

Validation

Independent documentation review: PASS, zero material or non-material findings. Exact two-file scope, committed diff whitespace, UTF-8/LF/no-BOM, current-status consistency, traceability, readability, and secret review passed.

The local documentation task's report-index result remains INCOMPLETE / exit 1: 14 optional missing, zero mandatory missing, zero failed, zero unknown. Its Owner exception applied only to that local documentation task. The independent review had its own static-only exception. Neither exception applies to hosted CI; this PR requires fresh Safe CI success for its exact head under normal repository policy.

Scope

Exactly two documentation files; no source, test, dependency, runtime, device, credential, or authorization behavior changes. No new live validation was performed for this correction.

S2-RO-10 and S2-RO-11 remain separately gated. This PR does not establish full Stage-2 Lab2 runtime completion, production readiness, or configuration-change capability. Final post-merge synchronization and closure require separate authorization.

@Robinlee0929
Robinlee0929 merged commit db7568f into main Sep 14, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant