every single equipment need to be turned into equipment.
it needs a:
name,
parameter,
process_type (from type),
category (from type),
type,
material (assume carbon for now),
purchase_costs
etc.
And the plant itself needs:
the equipments
process types
how nuch it produces
which country
variable OPEX inputs (complicated)
operator_hourly rate
interest rate
every single equipment need to be turned into equipment.
it needs a:
name,
parameter,
process_type (from type),
category (from type),
type,
material (assume carbon for now),
purchase_costsetc.
And the plant itself needs:
the equipments
process types
how nuch it produces
which country
variable OPEX inputs (complicated)
operator_hourly rate
interest rate