Execution Plan

Mission

Find a reproducible ORB-SLAM3 baseline and settings bundle that can process the user's stereo fisheye + IMU recordings, then document how to rerun and validate that result.

What "Working" Means

The target outcome is not just "ORB-SLAM3 compiled once." A successful first project slice should leave behind:

  • one documented ORB-SLAM3 source baseline and commit SHA
  • one reproducible build/run path from a fresh checkout
  • one settings bundle adapted to the user's rig and data format
  • one validation report from the user's dataset with logs and observed behavior
  • one recommendation that states what worked, what failed, and what remains

Technical Starting Point

  • The official ORB-SLAM3 repository documents stereo, fisheye, and visual-inertial support, including TUM-VI fisheye examples with and without IMU.
  • That upstream support lowers the algorithm risk, but it does not remove the integration risk for a custom stereo fisheye rig. The likely failure points are calibration quality, timestamp alignment, dataset formatting, dependency drift, and version or fork compatibility.

Intake Scope

This intake ticket should clarify:

  • the project goal and end-state artifacts
  • the minimum inputs required from the user
  • the order of downstream work
  • which open questions must be resolved before meaningful implementation starts

This intake ticket should not try to finish the PRD, build harness, backlog, or publication path early. Those each already have downstream issues.

Required Inputs From The User

Before the validation work can succeed, the project will need:

  • stereo recordings in a reproducible replay format
  • fisheye camera intrinsics and left/right extrinsics
  • camera-to-IMU extrinsics plus IMU noise/bias parameters
  • timestamp conventions and any known clock-offset behavior
  • frame rate, resolution, and any pre-processing already applied
  • a definition of acceptable validation quality on the user's dataset

If any of those are missing, the first engineering work should treat that gap as a blocker instead of guessing.

Risks To Retire Early

  • The user dataset may not match the file layout or timing assumptions expected by upstream ORB-SLAM3 examples.
  • Calibration may exist, but not in a form that maps cleanly into ORB-SLAM3 settings files.
  • IMU/image timing drift may dominate failures that look like "bad SLAM."
  • A settings-only fix may be insufficient; the best outcome may require picking a specific commit or maintained fork.
  • The bootstrap-generated deployment track may not mean "ship an app." For this repo, deployment probably means publishing a static validation report or other reproducible results artifact.

Downstream Issue Pack

HEL-42: PRD and success criteria

Use HEL-42 to lock the success contract:

  • define the target user and exact operating scenario
  • define pass/fail evidence for a "working" ORB-SLAM3 run
  • define what artifacts the repo must produce at handoff time
  • record the known unknowns from calibration, timing, and dataset shape

HEL-43: Engineering harness

Use HEL-43 to create the reproducible technical lane:

  • one canonical environment setup and dependency story
  • one build command and one aggregate validation command
  • one smoke-run path for a small representative sequence
  • clear locations for configs, calibration, datasets, logs, and tests

HEL-44: Backlog decomposition

Use HEL-44 after the PRD and harness settle. The likely implementation slices are:

  • dataset import and normalization
  • calibration translation into ORB-SLAM3 settings
  • candidate ORB-SLAM3 baseline evaluation
  • configuration tuning on the user's rig
  • final validation report and reproducibility cleanup

HEL-45: Deployment setup

Do not assume this repo needs a live application deployment. HEL-45 should first decide whether the project needs a publishable artifact at all. If it does, the likely target is a static report or results bundle rather than an interactive app.

First Next Actions For Symphony

  1. Use HEL-42 to turn the intake into an explicit success contract and list of required user-provided inputs.
  2. Use HEL-43 to build a minimal harness around one upstream ORB-SLAM3 baseline, with room to compare alternative commits or forks later.
  3. Once those two foundations exist, use HEL-44 to split the evaluation work into small tickets with concrete acceptance criteria.
  4. Revisit HEL-45 only after there is a concrete artifact worth publishing.