Skip to content

Add CI/CD actions

Add CI/CD actions #1

Triggered via pull request August 25, 2025 11:49
Status Failure
Total duration 31s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test (3.10)
Process completed with exit code 2.
test (3.12)
Process completed with exit code 2.
test (3.11)
Process completed with exit code 2.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_10" failed
test (3.8)
The operation was canceled.
test (3.8)
The strategy configuration was canceled because "test._3_10" failed
test (3.13)
The operation was canceled.
test (3.13)
The strategy configuration was canceled because "test._3_10" failed