Skip to content

chore: Internal Cleanup #5448

chore: Internal Cleanup

chore: Internal Cleanup #5448

Triggered via pull request February 23, 2026 22:23
Status Failure
Total duration 34s
Artifacts

import.yml

on: pull_request
Matrix: test-import
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test-import (3.11)
Process completed with exit code 4.
test-import (3.13)
The strategy configuration was canceled because "test-import._3_11" failed
test-import (3.13)
The operation was canceled.
test-import (3.10)
The strategy configuration was canceled because "test-import._3_11" failed
test-import (3.10)
The operation was canceled.
test-import (3.12)
The strategy configuration was canceled because "test-import._3_11" failed
test-import (3.12)
The operation was canceled.
test-import (3.14)
The strategy configuration was canceled because "test-import._3_11" failed
test-import (3.14)
The operation was canceled.