Epic
Epic 5: Production Adoption Readiness
Parent Initiative
Source
specs/planning-artifacts/epics.md
Story
As a consumer-team developer,
I want all delivered components to be correctly exported from the toolkit entry point,
So that application teams can adopt components without import-surface inconsistencies.
Acceptance Criteria:
Given delivered components must be publicly consumable
When export integrity checks are executed
Then all in-scope components are available from src/components/index.ts
And missing or broken exports are treated as blocking issues.
Given API contract consistency is required for adoption
When export and contract verification is reviewed
Then exported components align with expected public contract definitions
And contract exceptions are documented and traceable.
Given this story must be independently completable
When Story 5.3 is complete
Then entrypoint/export integrity evidence is ready for release review
And no future Epic 5 story is needed to establish export correctness baseline.
Epic
Epic 5: Production Adoption Readiness
Parent Initiative
Source
specs/planning-artifacts/epics.mdStory
As a consumer-team developer,
I want all delivered components to be correctly exported from the toolkit entry point,
So that application teams can adopt components without import-surface inconsistencies.
Acceptance Criteria:
Given delivered components must be publicly consumable
When export integrity checks are executed
Then all in-scope components are available from
src/components/index.tsAnd missing or broken exports are treated as blocking issues.
Given API contract consistency is required for adoption
When export and contract verification is reviewed
Then exported components align with expected public contract definitions
And contract exceptions are documented and traceable.
Given this story must be independently completable
When Story 5.3 is complete
Then entrypoint/export integrity evidence is ready for release review
And no future Epic 5 story is needed to establish export correctness baseline.