Skip to content

Merge tag 4.2.0 into 4.x #436

Merge tag 4.2.0 into 4.x

Merge tag 4.2.0 into 4.x #436

Triggered via pull request May 29, 2026 09:32
Status Cancelled
Total duration 25s
Artifacts

component-connectors.yml

on: pull_request
linux  /  Build and Test
22s
linux / Build and Test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
linux / Build and Test
Canceling since a higher priority waiting request for Steeltoe.Connectors-refs/pull/1710/merge exists
linux / Build and Test
The operation was canceled.
Steeltoe.Connectors
Canceling since a higher priority waiting request for Steeltoe.Connectors-refs/pull/1710/merge exists
Steeltoe.Connectors
Canceling since a higher priority waiting request for Steeltoe.Connectors-refs/pull/1710/merge exists