manifest/bazel: nested-workspace + Bazel-native Maven extraction #2009
ci.yml
on: pull_request
🧹 Lint Check
1m 1s
🔍 Type Check
28s
Matrix: 🧪 Test Matrix
Annotations
4 errors and 1 warning
|
🧪 Test Matrix (24, ubuntu-latest)
Process completed with exit code 1.
|
|
src/commands/fix/cmd-fix.integration.test.mts > socket fix > should handle CVE ID conversion for lodash vulnerability: `fix --id CVE-2021-23337 --config {"apiToken":"fake-token"}`:
test/utils.mts#L148
Error: Test timed out in 30000ms.
If this is a long-running test, pass a timeout value as the last argument or configure it globally with "testTimeout".
❯ cmdit test/utils.mts:148:3
❯ src/commands/fix/cmd-fix.integration.test.mts:521:3
|
|
🧪 Test Matrix (20, ubuntu-latest)
The strategy configuration was canceled because "test._24_ubuntu-latest" failed
|
|
🧪 Test Matrix (20, ubuntu-latest)
The operation was canceled.
|
|
🧹 Lint Check:
src/utils/purl-to-ghsa.mts#L4
`./errors.mts` import should occur before import of `./github.mts`
|