📋 Entrainer Selection Framework - Development Backlog
Overview
This document provides a comprehensive overview of the development backlog for the Safety-by-Design Framework for Ethanol-Water Separation Entrainer Selection.
🎯 RECOMMENDED EXECUTION SEQUENCE
Primary Path (Follow Phase Order):
1. INF-001 to INF-008 (Environment Setup + Data Schemas)
↓
2. P1-xxx: Phase I (Domain Mapping)
↓
3. P2A-xxx: Phase II-A (Graph-RAG)
↓
4. P2B-xxx: Phase II-B (TRIZ Agents)
↓
5. P2C-xxx: Phase II-C (Cheminformatics)
↓
6. P3-xxx: Phase III (Graph Traversal)
↓
7. P4-xxx: Phase IV (Bayesian Optimization)
↓
8. P5-xxx: Phase V (DWSIM Simulation) ←── DWSIM risk contained here
Risk Clarification (Updated from Consultation #8)
Risk
Scope
Impact on Phases 1-4
Mitigation
DWSIM COM fails
Phase 5 ONLY
❌ None
Plan-B fallbacks
Oracle slow (>1s)
Phase 4
❌ None on 1-3
Caching strategy
LLM hallucinations
Phase 2A/2B
❌ Contained
API verification
Key Insight: DWSIM is for VALIDATION only. Phases 1-4 produce a ranked candidate list independently. If DWSIM automation fails, manual validation or alternative simulators can be used.
Optional Risk Spikes (Can Be Deferred)
These were recommended by Consultation #8 but can be deferred to Phase 5:
Task
Original Priority
Updated Priority
Rationale
INF-009: DWSIM Spike
🔴 CRITICAL
🟢 Deferred to P5
Risk contained to Phase 5
INF-010: Oracle Benchmark
🔴 Critical
🟡 Before Phase 4
Only needed before MOBO
INF-012: Simulation Watchdog
🟡 High
🟢 Deferred to P5
Only needed for DWSIM
🚨 Critical Fixes (Must Implement)
Based on the technical review in Implementation Plan/Feedback to Improve.md AND Consultations #7 and #8, the following critical fixes MUST be implemented: